Trending Products China Kitchen Knife Blocker Knife and Chopstick Sterilizer with LED UV Sterilizer
With this motto in mind, we’ve got become among essentially the most technologically innovative, cost-efficient, and price-competitive manufacturers for Trending Products China Kitchen Knife Blocker Knife and Chopstick Sterilizer with LED UV Sterilizer, Since establishment during the early 1990s, we have now create our sale network in USA, Germany, Asia, and several Middle Eastern countries. We aim to be a top class supplier for globally OEM and aftermarket!
With this motto in mind, we’ve got become among essentially the most technologically innovative, cost-efficient, and price-competitive manufacturers for China LED UV Sterilizer, Uv Sterilizer, We believe in establishing healthy customer relationships and positive interaction for business. Close cooperation with our customers has helped us to create strong supply chains and reap benefits. Our goods have gained us widespread acceptance and the satisfaction of our worldwide valued clients.
“Survive on Quality”.We always attach great importance to quality controlling from the very beginning to the very end.
Our power cord is made from copper and nontoxic PVC(or rubber ) material and through the Directive 2011/65/EU
environmental protection directives.(Rohs)
Equipped with safety switch. If the lid is not in place, the machine will not start.
Low power 9W, energy saving and environmental protection.
Silicone suction cup at the bottom, stable and safe.
Description: | UV Knife Sterilizer | Item no.: | XDQ-01A |
Rated Voltage: | AC 220-240V/110V 50/60Hz | Rated Power: | 9W |
Operation Temperature: | 0–50℃ | Size of Product: | 110x110x300mm |
Sterilization wavelength: | 260-290nm | Net Weight: | 400g |
ODM&OEM manufacturing.
Samples ready in 1-3 business day and OEM order in 30-40days.
Prompt reply within 19 hours.
FAQ:
Q1:Are you a factory or trading company?
A1: We are a manufacturer of small home appliance .
Q2:How does your factory do regarding quality control?
A2:Raw material inspection, inspection during production, production completion inspection
Q3:Do you have a minimum order quantity?
A3:Our minimum order quantity is 3000 PCS
Q4:Can you OEM or ODM?
A4:OEM and ODM service are welcomed.
Q5:What is the average lead time?
A5:The lead time is 25-30 days after receiving the deposit payment.