OEM/ODM China New Design China Factory Wholesale Sterilizing UV Box for Knife Sterilizer
We’ve been committed to offering easy,time-saving and money-saving one-stop purchasing service of consumer for OEM/ODM China New Design China Factory Wholesale Sterilizing UV Box for Knife Sterilizer, We’re very proud of your fantastic popularity from our prospects for our products’ reputable quality.
We’ve been committed to offering easy,time-saving and money-saving one-stop purchasing service of consumer for China Knife Chopping Board Sterilizer UV Disinfection and Knife Chopping Board Sterilizer price, Whether selecting a current product from our catalog or seeking engineering assistance for your application, you can talk to our customer service center about your sourcing requirements. We’ve been looking forward to cooperating with friends from all over the world.
“Survive on Quality”.We always attach great importance to quality controlling from the very beginning to the very end.
Our power cord is made from copper and nontoxic PVC(or rubber ) material and through the Directive 2011/65/EU
environmental protection directives.(Rohs)
Equipped with safety switch. If the lid is not in place, the machine will not start.
Low power 9W, energy saving and environmental protection.
Silicone suction cup at the bottom, stable and safe.
Description: | UV Knife Sterilizer | Item no.: | XDQ-01A |
Rated Voltage: | AC 220-240V/110V 50/60Hz | Rated Power: | 9W |
Operation Temperature: | 0–50℃ | Size of Product: | 110x110x300mm |
Sterilization wavelength: | 260-290nm | Net Weight: | 400g |
ODM&OEM manufacturing.
Samples ready in 1-3 business day and OEM order in 30-40days.
Prompt reply within 19 hours.
FAQ:
Q1:Are you a factory or trading company?
A1: We are a manufacturer of small home appliance .
Q2:How does your factory do regarding quality control?
A2:Raw material inspection, inspection during production, production completion inspection
Q3:Do you have a minimum order quantity?
A3:Our minimum order quantity is 3000 PCS
Q4:Can you OEM or ODM?
A4:OEM and ODM service are welcomed.
Q5:What is the average lead time?
A5:The lead time is 25-30 days after receiving the deposit payment.