Good Wholesale Vendors China Disinfection Channel Sterilization Disinfection Walk Through Tunnel Disinfection Tunnel with Spray
To become the stage of realizing dreams of our employees! To build a happier, much more united and far more professional team! To reach a mutual profit of our clients, suppliers, the society and ourselves for Good Wholesale Vendors China Disinfection Channel Sterilization Disinfection Walk Through Tunnel Disinfection Tunnel with Spray, We’ve been sincerely searching forward to cooperate with prospects all over the environment. We imagine we are able to satisfy with you. We also warmly welcome consumers to go to our manufacturing unit and purchase our solutions.
To become the stage of realizing dreams of our employees! To build a happier, much more united and far more professional team! To reach a mutual profit of our clients, suppliers, the society and ourselves for China Disinfection Tunnel, Disinfection Channel, Our company, is always regarding quality as company’ s foundation, seeking for development via high degree of credibility , abiding by iso9000 quality management standard strictly , creating top-ranking company by spirit of progress-marking honesty and optimism.
Reliable quality, safe and secure.
Equipped with safety switch. If the lid is not in place, the machine will not start.
low power 9W, be good for saving energy.
Silicone suction cup at the bottom, stable and safe.
UV disinfection, safe and tasteless, good effect.
With touch switch.Easy to operate.
It can be used to sterilize chopsticks, knives, forks and spoons, as well as toothbrushes and small toys.
Also can disinfect the baby’s pacifier and so on.
Item No.: | XDQ-01A | Rated Power: | 9W |
Description: | Multi-funtion UV-sterilizer | Size of Product: | 110*110*300mm |
Rated Voltage: | AC 220-240V/110V 50/60Hz | Operation Temperatuer: | 0-50℃ |
Sterilization wavelength: | 260-290nm | Net Weight: | 400g |
Our engineers and sales leader have almost 20 years’ experience in this field.
Over 99% of our products are exported.
Delivery date within 25~30 days after receive the deposit.
Follow up customers’ feedback of the product after receive the products, andt try our best to solve and improve the quality.
FAQ:
Q1:Are you a factory or trading company?
A1: We are the manufacturer.
Q2:How does your factory do regarding quality control?
A2:Raw material inspection, inspection during production, production completion inspection
Q3:Do you have a minimum order quantity?
A3:Our MOQ is 3000 PCS for each item
Q4:Can you OEM or ODM?
A4:Yes, we have strong development department .
Q5:What is the average lead time?
A5:25-30days after receiving the deposit payment.