2019 High quality China UV Ozone Spray Tunnel Used for Public Place with Ce FCC
In order to greatest fulfill client’s requires, all of our operations are strictly performed in line with our motto “High Quality, Aggressive Selling price, Fast Service” for 2019 High quality China UV Ozone Spray Tunnel Used for Public Place with Ce FCC, We warmly welcome customers, business associations and friends from all over the world to contact us and seek cooperation for mutual benefits.
In order to greatest fulfill client’s requires, all of our operations are strictly performed in line with our motto “High Quality, Aggressive Selling price, Fast Service” for China Disinfection Tunnel, Disinfection Channel, With the highest standards of product quality and service, our products and solutions have been exported to more than 25 countries like the USA, CANADA, GERMANY, FRANCE, UAE, Malaysia and so on.We’ve been very happy to serve customers from all over the world!
1.passed the EU ROHS environmental protection directives.(Directive 2011/65/EU ).
2.Reliable quality, safe and secure.
3.If get off the lid, the machine won’t work.Because of safety lock.
4.9W low power, be good for saving energy.
5.The bottom with silicone suction cup , stable and safe.
Silicone sution cup Water tank
Description: | Sterilizer | Item no.: | XDQ-01A |
Rated Voltage: | AC 220-240V/110V 50/60Hz | Rated Power: | 9W |
Operation Temperature: | 0–50℃ | Size of Product: | 110x110x300mm |
Sterilization wavelength: | 260-290nm | Net Weight: | 400g |
more than 20 years specializes in the design and manufacture of small home appliances.
Prompt reply within 19 hours,.
Over 99% of small appliances are exported.
Follow up customers’ feedback of the product after receive the products, andt try our best to solve and improve the quality.
F A Q:
Q1:Are you a factory or trading company?
A1: We are the manufacturer.
Q2:How does your factory do regarding quality control?
A2:Raw material inspection, inspection during production, production completion inspection
Q3:Do you have a minimum order quantity?
A3:MOQ:3000pcs.
Q4:Can you OEM or ODM?
A4:OEM and ODM service are welcomed.
Q5:What is the average lead time?
A5:25-30days after receiving the deposit payment.